Home

About Us

Services

Projects

Key Personnel

News

Career

Contact


East International Terminal –
Hartsfield-Jackson Atlanta International Airport (H-JAIA)


The EIT project is a $750 million addition that includes a new terminal, parking deck, concourse, aircraft apron and associated infrastructure to support the new terminal.

ACCURA provided a Comprehensive Geotechnical Engineering Study for the new apron and associated infrastructure. The project included 40 feet high embankments and associated concrete cantilevered and reinforced earth retaining walls, relocation and/or protection of existing utilities including 2,000-foot long, 18-foot diameter Flint River Tunnel and construction of new NLVR Tunnel.



Our Services
4

Geotechnical Engineering

4
Pavement Engineering
4
Geotechnical Laboratory Services
4
Construction
Materials Testing
4
Pavement Materials
Laboratory Testing
Contact Us


Main Office

3342 International Park Dr.
Atlanta, GA 30316

Phone: 404-241-8722
Fax: 404-241-4577

   © 2004 Accura Engineering and Consulting Services, Inc. All Rights Reserved.